David L Howell
7791 Glenwood Avenue Magna, Utah 84044
(801)-244-2537 howell0508@msn.com
Electronic Portfolio: http://davidlhowell.weebly.com
QUALIFICATIONS
• Lead or supervisory position for 29 years, with 32 total years of construction experience
• Able to formulate project schedules that create a proper flow of work and completion in proper sequence
• Strong abilities to review plans and recognize conflicts with the design
• Well developed communication and assessment skills
• Ability to work independently or as a part of a team
• Experienced in many types of construction technologies
• 10 hour and 30 Hour OSHA Trained, SWPPP Trained 2009, .
• Construction Management for Contractors by the U.S. Army Corps of Engineers June 1994
• Successfully completed many Remodels on projects that required existing operation to continue without construction
impact
• Proficient in layout using a Trimble Robotic Total Station ,LM-80 layout software and Auto Cad drawing software
FIELD EXPERIENCE
Comtrol Inc.
Project Supervisor
Salt Lake City, Utah
2007-Present, 1992-2001
• Construction of a $5.5 million 40,885 sq. ft., 3 Story 72 unit residences with 10,900 sq. ft. of office and common use area
for the Salt Lake City Housing Authority at the Veterans Hospital Campus Salt Lake City, Utah
• Remodel $3.5 Million Veterans Hospital Campus Salt lake City, Utah Building 2, 2nd Floor remodel and Mechanical
upgrade
• Construction of a $23 Million Public Services Maintenance Facility for Salt Lake City Corporation.
• Construction of the $16 million East Lake Elementary School in the Daybreak subdivision for the Jordon School District.
• Construction of a new $17.4 million Junior High School for the Granite School District in Magna, Utah.
• Construction of a new office building Old Mill $3.2 million
• Project supervisor for the construction of four phase projects at the Davis County School District Administration Office
Complex totaling $5.5 million.
• Construction of the $15.2 million remodel of the main building for the Veterans Administration Hospital.
• Combined package at the Air Route Traffic Control Center (A.R.T.C.C.), Salt Lake City, Utah $13.5 million included the
building of a new power service building, which was a heavy steel open storage building.
Camco Construction Inc.
Project Supervisor
Salt Lake City, Utah
2006 –2007
• Mill Rock Park Office Salt Lake City, Utah Phase IV parking garage addition and new 5 story office Class A office.
Jacobsen Construction Inc.
Project Supervisor
Salt Lake City, Utah
2005 –2006
• Started the Ensign Plaza project in Ogden, Utah a 4 story office building with a parking garage in the basement.
• Started the Silver Strike Condominium Project in Deer Valley while the project team could be tasked to the project.
• Remodel of a portion of the existing Wasatch Canyons facility to house the Behavioral unit from Primary Children’s
Hospital.
• Build foundation for a pre-built building, housing a state of the art T-3 MRI.
• Tenant build-out in a shell space at Primary Children’s Hospital. Offices for the doctors and patient account services.
BIRD Construction (USA) Inc.
Project Supervisor
Salt Lake City, Utah
2001- 2005
• Construction of a new Border Crossing Station for the Department of Homeland Security. The project is a two phase $15
million, three story building with 60,000 sq. ft., with state of the art technology and will house various agencies at the
International Bridge in Sault Sainte Marie, Michigan.
• Complete remodel of the Cottonwood Mall Meier & Frank Department Store in Salt Lake City, Utah. The $6.3 million
remodel project was done in 7 phases and included the demolition of all finishes back to the building structure, installation
of a new electrical back bone, new HVAC system and completely new interior shell.
SOFTWARE
Microsoft Excel
Primavera P3
Microsoft Word
Microsoft Office Outlook
AutoDesk AutoCAD
Sure Track